This is a first draft of your proposal ring. Every detail below is still yours to shape.
Budget
AUD 5,000
Center Stone
Lavender Sapphire
Proposal
Date TBC
01 · Concept
Soft-Spoken, Hard to Forget
I'm centering everything on the sapphire itself, in a quiet, understated setting that lets the light do the talking rather than an elaborate mount. Libras have an instinct for balance and beauty, so this kind of restraint is a language she'll recognise the moment she sees it.
A few colour directions to consider. I'll be sourcing within these tones:
LavenderSoft violet-blue
Ceylon BlueSri Lankan blue
Cornflower BlueClassic cornflower
Three references: A and B are from the Australian brand @kavalri, in two quite different directions, and C is a ready-made piece you found on your own.
This plan is costed along the lines of Reference A. If you're drawn to Reference B's full halo instead, I'll adjust the specification and price to match. A few comparable pieces below, for context.
Aria is here as another oval-cut reference, in the same cluster style as Reference C. Chorus, Rosalie, and Snowdrift are sold as settings only, without a center stone, so they compare directly with the ‘Metal + Setting + Craftsmanship’ line:
Colours are sampled straight from the photos. Most of these sit above 2ct and cost a bit more than my estimate, so treat them as colour reference only. This is where sourcing pays off: I can usually find the same quality for a better price than these listings.
Two more from Nolan & Vada, leaning toward a truer royal blue, in pear and round cuts:
These run darker and truer blue, and cost a little less than the purple-blue tones at the same carat weight, though still above this plan's AUD 2,200–2,800 budget. Same story here: with the right sourcing, I can match this quality at a price that fits your budget.
Since Rachel mentioned leaning toward the purplish-blue tone, that's the direction I'll focus sourcing in, closer to the Purple Blue stones above rather than the cornflower or truer-blue options.
02 · Specification (Draft)
Specification
The configuration below is a first draft. Metal and setting are both still open to change.
Center Stone
Lavender Sapphire · 1.5–2ct
Cut
TBD · leaning oval or round
Metal
TBD · choice of yellow, rose, or white gold
Setting
TBD
Side Stones
TBD
Ring Size
AU Size I
03 · Estimate
Price Breakdown
The center stone is priced as a range for now, since I can only land on an exact number once the stone itself is chosen. Metal and setting are quoted at two price points, 18K or 14K, so the total comes out as a range too.
Center StoneLavender sapphire, 1.5–2ct, estimated range
AUD 2,200–2,800
Side StonesSetting isn't finalised yet, so this assumes a small diamond accent either side. AUD 250–500 covers lab-grown to natural diamonds
AUD 250–500
Metal + Setting + CraftsmanshipSetting the center and side stones, plus polishing, quoted at 18K or 14K gold
18K AUD 1,65014K AUD 1,450
International ShippingDelivery to Australia
AUD 80
TotalVaries with final carat weight + metal choice
18K AUD 4,180–5,03014K AUD 3,980–4,830
This is still a draft estimate, since the exact number depends on which stone I land on. Once sourcing starts, I'll share live quotes with you in real time, so you can see what's moving the price before anything is confirmed.
04 · Timeline
Delivery Timeline
Stone sourcing is locked in for Sep 14–20 in Hong Kong, the one date on this whole timeline that can't move. At this pace, I'm looking at delivery around early October. The filled dot below marks where things stand today.
Now – Sep 13
1 · Confirm the Plan
Ring size is confirmed at AU Size I; the setting direction will be locked in once I hear back from you
Sep 14–20 · Hong Kong
2 · Stone Sourcing
Selecting the lavender sapphire in person. This is the one date on the timeline that can't move.
Sep 21–24 · 3–4 days
3 · CAD + Render Approval
Modelled to the exact dimensions of the stone you choose; casting starts once you approve the design
Sep 25 – Oct 2–4 · 8–10 days
4 · Making: Casting / Setting / Polishing
I've built in buffer for rework, so nothing gets rushed
Oct 3–5 · 1 day
5 · Quality Check + Final Photos
From Oct 4–6
6 · International Shipping to Australia
Buffer for customs clearance, with earliest arrival around mid-October